Brochure download

Huddersfield case study 

Download our case study to discover more about the concept, the design challenges and the overall thoughts of the architects involved.

“The Oastler building at the
University of Huddersfield is an
outstanding piece of architecture
that provided some technical
challenges for the Maple team.
Load-bearing an array of steel
structures meant drawings,
manufacturing and fixings had to
be highly accurate to ensure the
end result.” Jay McGrath, Projects Director

For technical advice, please contact one of our project consultants.

Maple Sunscreening Huddersfield University.jpg